A-Z List | Accessible Info | Careers | Contact Us

 
Images from Peel Region

Notice of Addendum
Highway 50 & Mayfield Road Improvements

Study Area

The Study

In July, 2012, the Regional Municipality of Peel (Peel) completed the Highway 50 & Mayfield Road Improvements Class Environmental Assessment (EA) Study. The purpose of the study was to investigate potential roadway improvements to Highway 50 from Castlemore Road/Rutherford Road to Mayfield Road/Albion-Vaughan Road, and Mayfield Road from Highway 50 to Coleraine Drive. The Class EA for this project was conducted as a Schedule C undertaking in accordance with the Municipal Engineers Association (MEA) Municipal Class Environmental Assessment (October 2000, as amended in 2007 and 2011), as approved under the Ontario Environmental Assessment Act (the EA Act). The Environmental Study Report (ESR) documenting the planning and consultation process and the preferred design was filed in July, 2012.

In response to the availability of new information regarding the Coleraine Drive/Major MacKenzie Drive and Highway 50 intersection, Peel has prepared this Addendum to the Highway 50 & Mayfield Road Improvements Environmental Study Report for changes to the intersection configuration and related property requirements. This Addendum documents the proposed change, the rationale and implications of the change, and a summary of the consultation with stakeholders. Please note that only the changes proposed in the Addendum are open for review.

The Addendum is being placed on the public record for review in accordance with the requirements of the Municipal Class Environmental Assessment and is available for review at the following location:

Region of Peel
Clerk’s Department
10 Peel Centre Drive
5th Floor, Suite A
Brampton, ON
Monday to Friday: 8:30 a.m. to 4:30 p.m.

Further information may be obtained from:
Mr. Jimmy Chong, P.Eng.
Project Manager
Capital Works, Collection and Communal Treatment, Waste Water Division
Phone: 905-791-7800, ext. 7886
Email: Jimmy Chong

Please provide written comment to the Regional Clerk within 30 calendar days from the date of this Notice. If concerns regarding the revisions to the Highway 50 & Mayfield Road Improvements Class Environmental Assessment cannot be resolved through discussion with Peel, a person may request that the Minister of the Environment and Climate Change make an order for the project to comply with Part II of the Environmental Assessment Act (referred to as a Part II Order), which addresses individual environmental assessment.

Requests must be received by the Minister at the address below by November 22, 2014.
The Ministry/Minister of Environment and Climate Change
77 Wellesley Street West, 11th Floor
Toronto, ON, M7A 2T5
Fax 416 314 8452

A copy of the request must also be sent to the Regional Clerk. If no request is received by November 22, 2014, the Region intends to proceed with construction as outlined in the Addendum.

This notice was first issued on October 22, 2014

The Region of Peel is committed to ensure that all Regional services, programs and facilities are inclusive and accessible for persons with disabilities. Please contact the Project Manager if you need any disability accommodations to review the ESR.

 


 

evised: Thursday October 23 2014

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text