A-Z List | Accessible Info | Careers | Contact Us

 
--
Images from Peel Region

The Gore Road
Municipal Class Environmental Assessment Schedule C
from Queen Street to Castlemore Road
Notice of Study Completion

The study has been completed and the Environmental Study Report that details the planning, consultation and the decision making process for the recommended design is available for review.

enlarge [+]
Study area

Study Highlights

The proposed improvement for The Gore Road includes:

  • Maintaining the existing 4 lanes;
  • Modifying intersections for transit, active transportation and turning;
  • Addition of bus stops/bus bays including a new bus shelter (in large island) at a redesigned Queen Street/The Gore Road intersection;
  • Narrow lane widths;
  • Improve safety with signalized bike/pedestrian crossing (location(s) - to be confirmed during detailed design);
  • Signal timing improvements at The Gore Road and Queen Street intersection;
  • Providing the opportunity for a healthy lifestyle through connections to multi-use trails;
  • Sidewalks and raised cycle tracks on both sides of The Gore Road;
  • On east side of road at the 2 Wylie Bridges, multi-use trail around Wylies Creek;
  • Cross ride treatments at intersections;
  • Pedestrian/cyclist crossings at school locations;
  • Low Impact Design (LID) to manage stormwater at various locations throughout The Gore Road corridor; and
  • Streetscaping (to be confirmed during design).

Please visit the project website for additional information: peelregion.ca/pw/transportation/environ-assess/ea-the-gore-road.htm

Environmental Study Report Review Period

The study documents will be available for review for 30 calendar days at the following location starting on November 17, 2016 and ending on December 16, 2016.

Clerk, Region of Peel
10 Peel Centre Dr.
5th Floor, Suite A
Brampton, ON L6T 4B9
Phone: 905-791-7800
Hours:
Mon-Fri: 8:30 a.m. – 4:30 p.m.
Clerk, City of Brampton
2 Wellington St. West
Brampton, ON L6Y 4R2
Phone: 905-874-2000
Hours:
Mon-Fri: 8:30 a.m. – 4:30 p.m.
Brampton Public Library
Gore Meadows Branch (Community Centre)
10150 The Gore Rd.
Brampton, ON L6P 0A6
Phone: 905-793-4636
Hours:
Mon-Thurs: 10 a.m. – 9 p.m.
Fri: 10 a.m. – 6 p.m.
Sat: 10 a.m. – 5 p.m.
Sun: 1 p.m. – 5 p.m.


Written comments should be provided to Sally Rook, Manager, Infrastructure Programming & Studies, within the 30 day calendar review period. If you have conerns that cannot be addressed, you may request that the Minister of the Environment and Climate Change make an Order for the project to comply with Part II of the Environmental Assessment Act, which addresses individual environmental assessments. The Minister must receive the request at the address below by 4:30 p.m. on December 16, 2016.

Minister, Ministry of the Environment and Climate Change
77 Wellesley St. West, 11th Floor
Toronto, ON M7A 2T5

A copy of the Part II Order request must also be sent to the Manager at the following address:

Sally Rook, C.Tech, PMP
Manager, Infrastructure Programming & Studies
Transportation Division
Region of Peel
10 Peel Centre Dr., 4th Floor, Suite B
Brampton, ON L6T 4B9
Tel: 905-791-7800 ext. 7842

If no Part II Order requests are received then the Region may proceed with the detailed design and construction of the recommended works as presented in the study.

This notice was first issued on November 17, 2016.

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text