Construction in Peel: Brampton

Widening and Reconstruction of Mississauga Road
Projects # 02-4090, 06-4025 and 12-4040

What are we doing?

  • Widening and reconstruction of Mississauga Road and Bovaird Drive intersection.
  • Remove and replace two (2) culverts
  • Installation of 1200mm and 900mm Concrete Pressure Pipe watermains and valve chamber
  • Construction of a geotextile reinforced retaining wall along Huttonville Creek
  • Installation of an LID system along the east side of Mississauga Road, South of Bovaird Drive;
  • Installation of landscaping along Mississauga Road and along Huttonville Creek
  • Installation of enhanced swales along the west side of Mississauga Road, South of Bovaird Drive;

Where?

  • Approximately 300m north of Williams Parkway to approximately 330m north of Bovaird Drive and the widening and reconstruction of Bovaird Drive from 300m west of Mississauga Road to 530m east of Mississauga Road, as shown on the attached map.

When?

  • Start: June, 2016
  • Finish: Summer August 9, 2018, weather permitting.

Who can you call?

The work will be performed by Varcon Construction Corporation with Contract Administration services provided by WSP Group on behalf of the Region of Peel. The contact names and telephone numbers are listed below:

Region of Peel Personnel
Contact Responsibilities Phone Number
John Hasselbacher Project Manager 905-791-7800, ext. 7912
Asad Rauf Senior Inspector 905-791-7800, ext. 3246
Varcon Construction Corporation
Contact Responsibilities Phone Number
Mark Golding Project Manager 905-794-2041
Chris Martin Site Superintendent 647-529-7209
WSP Group
Contact Responsibilities Phone Number
Bob Koziol Project Manager 905-882-4211
Richard David Contract Administrator 647-291-7769

Working Hours

  • Our contractor’s normal working hours are from 7 a.m to 7 p.m.
  • These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but a shorter working day would mean the project would take longer to complete.

Traffic and Parking Control

  • Temporary lane closures will be required during non-peak hours.
  • Emergency access will be maintained at all times.
  • Barriers and signs will be placed for safety and direction, as required under the Occupational Health and Safety Act.

Driveway Access

  • We anticipate that driveway access will be maintained in so far as possible.
  • If we need to block your driveway for a short time you will be contacted to arrange for the best time and for alternate access. If your driveway is blocked, you may choose to park on a side street for a short time.
  • We will make sure businesses have access at all times.
  • Please call the Project Manager if you have special needs related to access or business hours.

Project Updates

  • The Region of Peel will keep you informed of any substantial changes in the project scope or schedule.
  • We are committed to ensuring minimum disruption to your homes and businesses.
  • Please call the project manager or inspector if you have any special needs.

Email questions or comments

| Back to Brampton Construction Projects |

Revised: Wednesday September 27 2017

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text