Construction in Peel: Brampton

Widening and Reconstruction of The Gore Road
from Queen Street to Highway 50
Project 10–4070

Scheduled Work

  • Widening and reconstruction of the Gore Road from 2–lanes to 4–lanes (PDF)
    • Replacement of the Clarkway Drive Tributary structure on the Gore Road and realignment of the Clarkway Drive Tributary
    • Construction of retaining walls along the Gore Road
    • Construction of relief culverts on Manswood Crescent
    • Reconstruction of Gore Road and Queen Street intersection (Provisional)
  • Modifying the horizontal alignment
  • Addition of northbound and southbound left turn lanes
  • Transit Improvements

When?

  • June 19 – 23, 2017: Construction crews will mobilize on site
  • June 26, 2017: Construction begins
  • July 4, 2017: Full road closure begins
  • Finish: Fall 2018, weather permitting

Who can you call?

Region of Peel
Contact Person Responsibilities Telephone Number
John Hasselbacher Project Manager 905–791–7800 ext. 7912
Ommar Moeen Construction Inspector 647–643–3627 (cell)
Graham Bros. Construction Limited
under contract to the Region of Peel
Contact Person Responsibilities Telephone Number
Tony Mastroianni Project Manger 905–453–1200
Quinton Oates Superintendent 905–867–2099 (cell)

Working Hours

  • The Contractor's working hours are from 7AM to 7PM, Monday to Friday. The Contractor is permitted to work on Saturdays if they choose to.
  • These hours are consistent with the local municipality's bylaws. We understand this may cause some inconvenience, but a shorter working day would mean the project would take longer to complete.

Provisional Works

  • The reconstruction of the intersection of The Gore Road and Queen Street has been included as provisional works in this construction contract. The reconstruction of the intersection was advanced from a future project and included as provisional works, in an attempt to address current operational problems at the intersection.
  • These works are included as provisional due to the requirement to relocate utilities prior to reconstruction works commencing. Utility relocation is underway. If utility relocation is completed in time, the intersection reconstruction works will proceed.

Traffic Control

  • Temporary lane closures are necessary to complete the works.
  • A full road closure of The Gore Road will be required for construction of the bridge over the Clarkway Tributary and the Manswood Crescent relief culverts. Detour routes during the closure will be clearly signed as per the attached detour map. Manswood Crescent will be accessible from the north leg during Phase A Road Closure.
  • Peel Regional Police may be present during initial lane closures, milling and paving operations and at intersections to direct traffic safely.
  • Emergency access will be maintained at all times.
  • Barriers and signs will be placed for safety and direction, as required under the Occupational Health and Safety Act.

Driveway Access

  • If we need to block your driveway, you will be contacted for alternate access.
  • We will ensure residents and businesses have access at all times.
  • Please contact the Project Manager if you have special needs related to access or business hours.

Project Updates

  • The Region of Peel will keep you informed of any substantial changes in the project scope or schedule.
  • We are committed to ensuring minimum disruption to your homes and businesses.
  • Please contact the Project Manager or Inspector if you have any special needs.

Email questions or comments

| Back to Brampton Construction Projects |

Revised: Friday June 23 2017

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text