Public Works Construction

Construction in Peel: Brampton

Sanitary Sewer and Watermain Replacements on Various Streets in the City of Brampton,
City of Brampton
Projects 11-2320 and 12-1375

Project Description

The Region of Peel will be replacing the existing sanitary sewer on English Street, from Murray Street to Moore Street in order to improve the existing services in the area (see map 229KB). View road closer notice.

Schedule

Construction is scheduled to commence on or about March 11, 2013. We anticipate completing the works by the end of August 2013.

Contacts Persons

The works will be performed by Rymall Construction Inc under contract to the Region of Peel. The Contractor’s on-site representative will be Vince Fabiano. The contact persons and phone numbers are listed below:

Region of Peel Personnel
Contact Responsibilities Phone Number
Tom Graovac Construction Inspector 905-791-7800 ext. 3246
Derek Gorzynski Project Manager 905-791-7800, ext. 5013
Shaun Hussain Project Manager 905-791-7800, ext. 7832
Contractor Personnel
Contact Responsibilities Phone Number
Bob Clarke Project Manager 416-745-0707 ext. 227
Vince Fabiano Site Superintendent 416-745-0707 ext. 223
Piero Fabiano Site Superintendent 416-745-0707 ext. 225

Traffic and Parking Control

The works will be phased so as to minimize disruption to traffic while still maintaining a safe working environment as required under the Occupational Health and Safety Act.

During this period, temporary lane closures will be in effect in portions of the construction area.

Once work is completed, the roadway will be completely restored to permit traffic. In this manner the loss of traffic lanes will be minimized throughout the construction period.

Full pedestrian access will be maintained at all times to residential homes on all streets. If you have particular needs, please contact us ahead of time and we will attempt to accommodate them.

Driveway Access

During construction, your driveway access may be temporarily blocked. We will contact you prior to crossing your driveway to arrange for the best time and for alternate access, if required. Additional signs will be placed if alternate routes are required.

Water Supply and Interruptions

Should construction require an interruption of your water supply we will contact you prior to interrupting your water supply to arrange for the best time. However, if an emergency shut down of the water supply is required due to unforeseen circumstances, we will make every attempt to minimize the inconvenience of the water shut down.

Sod Restoration And Maintenance

The contractor will provide initial care for replacement sod with-in affected areas, for a period of thirty (30) days after placement to allow for the root penetration into the topsoil.

To ensure that the sod/seed stays healthy, particularly during hot and dry weather, watering the new sod/seed two to three times a week for one hour, during the early morning, will promote healthy and durable sod.

We thank you in advance for your assistance in helping to maintain the health and durability of the new sod/seed.

Please be aware that any maintenance repairs done during winter months will have final restoration scheduled for the following spring/summer season.

Project Updates

The Region of Peel is committed to keeping you informed and ensuring that the works are carried out with minimum disruption to your homes and businesses. If there are any substantial changes in the project scope or schedule, you will be provided with project updates. We also encourage you to notify the appropriate contact person to advise them of any problems or particular needs. We thank you in advance for your co-operation.

Email questions or comments

| Back to Brampton Construction Projects |





Revised: Monday March 04 2013

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text