Public Works Construction

Construction in Peel: Brampton

Watermain, Sanitary Replacement and Improvement Dana Court From Duke Road To End
Project # 14-1375 G & 14-2310

We have finished the work. This project is under warranty until June 2018.

What are we doing?

  • Replacing and improving the aging watermain and sanitary sewer along Dana Court as shown on the attached map.
  • Replacing the water service pipe to your service box and sanitary sewer lateral to property line.

Why?

  • To upgrade the water system and sanitary sewer system capacity and reliability as part of the Region of Peel's State of Good Repair program.

When?

  • We expect to start work on or about the week of April 4, 2016
  • The project should be completed by the end of July 2016.
  • We will start restoring the road when all water system and sanitary sewer system replacements are complete, and as weather permits.

Who can you call?

Region of Peel
Contact Responsibilities Phone Number
Greg Beams Project Manager 905-791-7800, ext. 7839
Sajmir Zesllari Inspector 905-791-7800, ext. 3246
Lancorp Construction
Lancorp Construction will do the work, under contract to the Region of Peel
Contact Responsibilities Phone Number
Eliseo Lancione Project Manager 905-660-0778
Tony Vuocolo Site Superintendent 905-660-0778

Working Hours

  • Our contractor's normal working hours are from 7 a.m. to 7 p.m. These hours are consistent with the local municipality's bylaws. We understand this may cause some inconvenience, but a shorter working day would mean the project would take longer to complete.

Traffic and Parking Control

  • We may need to reduce traffic to a single lane during construction.
  • If we have to reroute traffic, we will place signs giving directions.
  • On-street parking will be reduced during construction.

Driveway Access

  • We may need to block your driveway for a short time. We will contact you before we do this to arrange for the best time and for alternate access, if needed. If your driveway is blocked, you may choose to park on a side street for a short time. If you need immediate access to your driveway, the contractor will have road plates available to quickly allow access in and out of your driveway.
  • We will make sure businesses have access at all times.
  • Please call the Project Manager if you have special needs related to access or business hours.

Irrigation or Sprinkler Systems

  • Please tell the inspector if you have underground irrigation or a sprinkler system outside your property line.
  • You may wish to move the sprinkler lines to inside your private property to avoid damage.

Trimming Trees

  • If tree branches within the right-of-way interfere with construction, the contractor will have the trees pruned before equipment enters the drip line of the tree.
  • If tree branches on private property interfere with construction, they will be pruned back to the nearest suitable trunk, crotch or branch.
  • The contractor will ask you for permission before cutting any branches on private property. If you do not allow the contractor onto your property to trim the branches, the branches will be cut vertically at the property line.

Interrupting Your Water Supply

  • It is our goal to let you know 48 hours (2 days) in advance if we need to shut off your water. Occasionally, we may have to reduce this notice to 24 hours.
  • If we have to shut off your water because of an emergency, we will do everything we can to fix the problem as quickly as possible.

Vibrations

  • You may feel slight vibrations from the construction work.

Replacing and Taking Care of Your Sod

  • The contractor will take care of any sod we replace for 30 days.
  • You can help the sod to stay healthy by watering it for one hour in the early morning, two or three times a week. This is especially important in hot or dry weather.
  • We will replace your sod as soon as we can, but there may be a short delay.

Repairing Your Driveway

  • If we need to cut your driveway to replace the existing service valve or access the watermain, we will repair the asphalt in the disturbed area from edge to edge across the driveway.  Unfortunately the Region cannot completely replace your driveway.
  • Several weeks before the driveway restoration work, we will send you an update with contact information for the contractor, in case you wish to have the remainder of your driveway (private side) paved at the same time.
  • If you have any concerns, please call the Project Manager.
  • We will repair your driveway as soon as we can, but there may be a short delay.

Repairing the Road, Curbs and Sidewalks

  • We will start restoring the road and boulevard once all replacements and service transfers are complete and as weather permits.

Project Updates

  • The Region of Peel will always let you know if there are any major changes to the plans.
  • We will try to disturb you as little as possible.
  • Please call the project manager or inspector if you have any problems or special needs.

How Did We Do?

  • After we've finished, we will give you a postage-paid card for you to rate our work
  • Please complete the card and mail it back to us.

Email questions or comments

| Back to Brampton Construction Projects |

Revised: Friday September 02 2016

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text