A-Z List | Accessible Info | Careers | Contact Us

 
--
Images from Peel Region
Public Works on Twitter
Google Translate Feedback
Was this translation useful?
Yes No
Comments on translation:

Thank you for your feedback!
Public Works Construction

Construction in Peel: Brampton

Watermain and Sanitary Sewer Replacement and Improvement
Massey Street
Project #14-1375 C

Updates

We have finished the project. The work is under warranty until July 2018.

What are we doing?

  • Replacing and improving the aging watermain and sanitary sewer along Massey Street from Mandarin Crescent to North Park Drive as shown on the attached map.
  • Replacing the water service pipe to your service box and sanitary sewer lateral to property line.

Why?

  • To upgrade the water system and sanitary sewer capacity and reliability as part of the Region of Peel’s State of Good Repair program.

When?

  • We expect to start work the week of June 22, 2015.
  • The project should be completed by end of August 2015.
  • We will start restoring the road when all water system replacements and transfers are complete, and as weather permits.

Who can you call?

Region of Peel
Contact Responsibilities Phone Number
Frank Pugliese Project Manager 905-791-7800, ext. 5943
Tom Graovac Inspector 905-791-7800, ext. 3246
Mastercrete Inc.
Mastercrete Inc. work, under contract to the Region of Peel
Contact Responsibilities Phone Number
Matthew Fusillo Site Superintendent 905-890-8889

Working Hours

  • Our contractor’s normal working hours are from 7 a.m. to 7 p.m. We apologize for any inconvenience this may cause, but a shorter working day would mean the project would take longer to complete.

Traffic and Parking Control

  • We may need to reduce traffic to a single lane during construction.
  • If we have to reroute traffic, we will place signs giving directions.
  • On-street parking will be reduced during construction.

Driveway Access

  • Due to construction activities, we may need to block your driveway for a short time. We will contact you before we do this to arrange for the best time and for alternate access, if needed. If your driveway is blocked, you may choose to park on a side street for a short time. If you need immediate access to your driveway, the contractor will have road plates available to quickly allow access in and out of your driveway.
  • Please call the Project Manager if you have special needs related to access or business hours.

Irrigation or Sprinkler Systems

  • Please tell the inspector if you have underground irrigation or a sprinkler system outside your property line.
  • You may wish to move the sprinkler lines to inside your private property to avoid damage.

Trimming Trees

  • If tree branches within the right-of-way interfere with construction, the contractor will have the trees pruned before equipment enters the drip line of the tree.
  • If tree branches on private property interfere with construction, they will be pruned back to the nearest suitable trunk, crotch or branch.
  • The contractor will ask you for permission before cutting any branches. If you do not allow the contractor onto your property to trim the branches, the branches will be cut vertically at the property line.

Interrupting Your Water Supply

  • It is our goal to let you know 48 hours (2 days) in advance if we need to shut off your water. Occasionally, we may have to reduce this notice to 24 hours.
  • If we have to shut off your water because of an emergency, we will do everything we can to fix the problem as quickly as possible.

Vibrations

  • You may feel slight vibrations from the construction work.

Replacing and Taking Care of Your Sod

  • The contractor will take care of any sod we replace for 30 days.
  • You can help the sod to stay healthy by watering it for one hour in the early morning, two or three times a week. This is especially important in hot or dry weather.
  • We will replace your sod as soon as we can, but there may be a short delay.

Repairing Your Driveway

  • If we need to cut your driveway to complete our works, we will repair the asphalt in the disturbed area from edge to edge across the driveway. Unfortunately the Region cannot completely replace your driveway.
  • If you have any concerns, please call the Project Manager.
  • We will repair your driveway as soon as we can, but there may be a short delay.

Repairing the Road, Curbs, and Sidewalks

  • We will start restoring the road and boulevard once all replacements and service transfers are complete and as weather permits.

Project Updates

  • The Region of Peel will always let you know if there are any major changes to the plans.
  • We will try to disturb you as little as possible.
  • Please call the project manager or inspector if you have any concerns or special needs.

How Did We Do?

  • After we’ve finished, we will give you a postage-paid card for you to rate our work.
  • Please complete the card and mail it back to us.

Email questions or comments

| Back to Brampton Construction Projects |

Revised: Thursday March 09 2017

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text