Public Works Construction

Construction in Peel: Brampton

Credit River Tributary Culvert Rehabilitation
Bovaird Drive West
Project # 15-4890

We have finished the work. The project is under warranty until October 2018.

What are we doing?

  • Removing a portion of the existing culvert under Bovaird Drive and installing a new cast-in-place concrete box culvert.
  • Creek work including channel realignment and improvements for fish passage.
  • Works including site preparation, tree removal, earth excavation, traffic staging, and restoration.

Where?

  • Approximately 1km West of Heritage Road as shown on the attached map.

When?

  • Start: Spring 2016
  • Finish: Winter 2016, weather permitting.
  • This project has been completed.

Who can you call?

  • The work will be performed by Metric Contracting Services Corporation with Contract Administration and Inspection services provided by Amec Foster Wheeler on behalf of the Region of Peel. The contact names and telephone numbers are listed below:
Metric Contracting Services Corporation
Contact Responsibilities Phone Number
Marco Parmegiani Project Manager 905-793-4100 ext. 109
Lui Vescio Site Superintendent 905-793-4100 ext. 125
Amec Foster Wheeler
Contact Responsibilities Phone Number
Ivan Marcisin Contract Administrator 905-335-2353 ext. 208
David Sinke Project Manager 905-335-2353 ext. 287
Region of Peel
Contact Responsibilities Phone Number
Dan Bennington Project Manager 905-791-7800 ext. 7811
Asad Rauf Senior Inspector 905-791-7800 ext. 3256

Working Hours

  • Our contractor’s normal working hours are from 7 a.m to 7 p.m.
  • These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but a shorter working day would mean the project would take longer to complete.

Traffic and Parking Control

  • One lane will be closed to traffic during the project and temporary lane shifts to isolate the work zone.
  • Temporary lane closures will be required during non-peak hours.
  • Emergency access will be maintained at all times.
  • Barriers and signs will be placed for safety and direction, as required under the Occupational Health and Safety Act.

Driveway Access

  • We anticipate that driveway access will be maintained in so far as possible.
  • If we need to block your driveway for a short time you will be contacted to arrange for the best time and for alternate access. If your driveway is blocked, you may choose to park on a side street for a short time.
  • We will make sure businesses have access at all times.
  • Please call the Project Manager if you have special needs related to access or business hours.

Project Updates

  • The Region of Peel will keep you informed of any substantial changes in the project scope or schedule.
  • We are committed to ensuring minimum disruption to your homes and businesses.
  • Please call the project manager or inspector if you have any special needs.

Email questions or comments

| Back to Brampton Construction Projects |

Revised: Wednesday November 23 2016

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text