Construction of 1050/1350MM sanitary sewer and 150MM watermain
Queensway/Hurontario area. Project 10-2425 and 14-1349
We have finished the work. The project is under warranty until January 2019.
What we are doing
- Installing a new sanitary sewer along Queensway West, Hurontario Street and Sherobee Road between Mavis Road and Camilla Road. Upgrading the existing watermain at the corner of Queensway West and Hurontario Street and Gordon Drive. View area map (PDF).
Why
- To improve the existing sanitary sewer system capacity and ensure the water system reliability to accommodate planned future growth from the Mississauga City Centre and Highway 10.
When
- We expect to start work the week of August 17, 2015.
- The project should be completed by July 2017.
- We will start restoring the road when all sanitary sewer and watermain installation works are complete, and as weather permits.
Who you can call
Region of Peel Personnel | ||
Contact | Responsibilities | Phone Number |
---|---|---|
Grace Krasowski | Project Manager Wastewater | 905-791-7800, ext. 7820 |
AECOM AECOM will administrate the work, under contract to the Region of Peel |
||
David O’Gorman | Contract Administrator | 647-229-0934 |
Kevin Martin | Inspector | 416-884-5360 |
Drainstar Contracting Ltd. Drainstar Contracting Ltd. will do the work, under contract to the Region of Peel |
||
Mike Skrisantha | Project Manager | 416-990-0117 |
Tony Cota | Site Superintendent | 416-990-7780 |
Working hours
- Our contractor’s normal working hours are from 7 a.m. to 7 p.m.
Traffic and parking control
- We may need to reduce traffic lanes during construction. There will be adequate signage giving the public advanced warnings.
Driveway access
- We will make sure businesses have access at all times.
- Please call the Project Manager if you have special needs related to access or business hours.
Irrigation or sprinkler systems
- Please tell the Inspector if you have underground irrigation or a sprinkler system outside your property line. You may wish to move the sprinkler lines to inside your private property to avoid damage.
Trimming trees
- If tree branches within the right-of-way interfere with construction, the contractor will have the trees pruned before equipment enters the drip line of the tree. If tree branches on private property interfere with construction, they will be pruned back to the nearest suitable trunk, crotch or branch. The contractor will ask you for permission before cutting any branches. If you do not allow the contractor onto your property to trim the branches, the branches will be cut vertically at the property line.
Interrupting your water supply
- We will try to let you know 48 hours (2 days) before we need to shut off your water. Occasionally, we may have to reduce this notice to 24 hours.
- If we have to shut off your water because of an emergency, we will do everything we can to fix the problem as quickly as possible.
Vibrations
- The construction work may generate slight vibrations. As a precaution, you may consider removing or securing small, light or fragile objects from shelving and walls during the construction period.
Replacing and taking care of your sod
- The contractor will take care of any sod we replace for 30 days.
We will replace your sod as soon as we can, but there may be a short delay.
Repairing your driveway
- If we need to cut your driveway we will repair the asphalt in the disturbed area from edge to edge across the driveway. Unfortunately the Regioncannotundertake complete driveway replacement.
- We will repair your driveway as soon as we can, but there may be a short delay.
- Several weeks before the driveway restoration work, we will send you an update with contact information for the contractor, in case you wish to have the remainder of your driveway (private side) paved at the same time.
- If you have any concerns, please call the Project Manager.
Project updates
- The Region of Peel will always let you know if there are any major changes to the plans. We will try to disturb you as little as possible. Please call the Project Manager if you have any concerns or special needs.