Public Works Construction

Construction in Peel: Mississauga

Watermain Replacement and Improvement
Sheridan Homelands
Project 14-1345 H

We have finished the work. The project is under warranty until November 2017.

What are we doing?

  • Replacing and improving the aging watermain along Pyramid Crescent, Corsica Court, Woking Crescent, Wadding Crescent, and Arioso Court as shown on the attached map.
  • Replacing the water service pipe to your service box.

Why?

  • To upgrade the water system capacity and reliability as part of the Region of Peel’s State of Good Repair program.

When?

  • We expect to start work in March 2015, starting at Pyramid Crescent and Corsica Court.
  • The project should be completed by the end of 2015.
  • We will start restoring the road when all water system replacements and transfers are complete, and as weather permits.
Region of Peel Personnel
Contact Responsibilities Phone Number
Lyle LeDrew, C.E.T Project Manager 905-791-7800, ext. 7836
George Da Re Inspector 905-791-7800, ext. 3246
Rymall Construction
Rymall Construction will do the work, under contract to the
Region of Peel
Contact Responsibilities Phone Number
Bob Clarke Project Manager 416-745-0707
Piero Fabiano Site Superintendent 416-745-0707

Working Hours

  • Our contractor’s normal working hours are from 7 a.m. to 7 p.m. We apologize for any inconvenience this may cause, but a shorter working day would mean the project would take longer to complete.

Traffic and Parking Control

  • We may need to reduce traffic to a single lane during construction.
  • If we have to reroute traffic, we will place signs giving directions.
  • On-street parking will be reduced during construction.

Driveway Access

  • Due to construction activities, we may need to block your driveway for a short time. We will contact you before we do this to arrange for the best time and for alternate access, if needed. If your driveway is blocked, you may choose to park on a side street for a short time. If you need immediate access to your driveway, the contractor will have road plates available to quickly allow access in and out of your driveway.
  • We will make sure businesses have access at all times.
  • Please call the Project Manager if you have special needs related to access or business hours.

Irrigation or Sprinkler Systems

  • Please tell the inspector if you have underground irrigation or a sprinkler system outside your property line.
  • You may wish to move the sprinkler lines to inside your private property to avoid damage.

Trimming Trees

  • If tree branches within the right-of-way interfere with construction, the contractor will have the trees pruned before equipment enters the drip line of the tree.
  • If tree branches on private property interfere with construction, they will be pruned back to the nearest suitable trunk, crotch or branch.
  • The contractor will ask you for permission before cutting any branches. If you do not allow the contractor onto your property to trim the branches, the branches will be cut vertically at the property line.

Interrupting Your Water Supply

  • It is our goal to let you know 48 hours (2 days) in advance if we need to shut off your water. Occasionally, we may have to reduce this notice to 24 hours.
  • If we have to shut off your water because of an emergency, we will do everything we can to fix the problem as quickly as possible.

Vibrations

  • You may feel slight vibrations from the construction work.

Replacing and Taking Care of Your Sod

  • The contractor will take care of any sod we replace for 30 days.
  • You can help the sod to stay healthy by watering it for one hour in the early morning, two or three times a week. This is especially important in hot or dry weather.
  • We will replace your sod as soon as we can, but there may be a short delay.

Repairing Your Driveway

  • If we need to cut your driveway to replace the existing service valve or to gain access to the watermain, we will repair the asphalt from edge to edge across the driveway within the limits of disturbance, or from the sidewalk to beyond the damaged area. Unfortunately the Region cannot completely replace your driveway.
  • We will repair your driveway as soon as we can, but there may be a short delay.
  • Several weeks before the driveway restoration work, we will send you an update with contact information for the contractor, in case you wish to have the remainder of your driveway (private side) paved at the same time.
  • If you have any concerns, please call the Project Manager.

Repairing the Road, Curbs, and Sidewalks

  • We will start restoring the road and boulevard once all replacements and service transfers are complete and as weather permits.
  • We will complete the restoration on a street-by-street basis.

Project Updates

  • The Region of Peel will always let you know if there are any major changes to the plans.
  • We will try to disturb you as little as possible.
  • Please call the project manager or inspector if you have any concerns or special needs.

How Did We Do?

  • After we’ve finished, we will give you a postage-paid card for you to rate our work.
  • Please complete the card and mail it back to us.

Email questions or comments


| Back to Mississauga Construction Projects |

Revised: Friday November 20 2015

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text