Public Works Construction

Construction in Peel: Mississauga

Watermain Replacement and Improvement
Erin Mills Parkway from Burnhamthorpe Road to Folkway Drive
Project 14-1346 & 15-1345 N

We have finished the work. This project is under warranty until July 2018.

What are we doing?

  • Replacing and improving the aging watermain Erin Mills Parkway as shown on the attached map.
  • Replacing the water service pipe to your service box.

Why?

  • To upgrade the water system capacity and reliability as part of the Region of Peel’s State of Good Repair program.

When?

  • We expect to start work on or about March 1, 2016
  • The project should be completed before June 2016. All work is under warranty for two years from the completion date.
  • We will start restoring the road when all water system replacements and transfers are complete, and as weather permits.

Who can you call?

Region of Peel
Contact Person Responsibility Telephone Number
Greg Beams Project Manager 905-791-7800, ext. 7839
Gus Afuwape Inspector 905-791-7800, ext. 3246
London Excavators & Trucking Ltd.
London Excavators & Trucking Ltd. will do the work, under contract to the
Region of Peel
Massimo Sansone Project Manager 416-247-6601
Frank Carelli Site Superintendent 416-247-6601

Working Hours

  • Our contractor’s normal working hours are from 7 a.m. to 7 p.m. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but a shorter working day would mean the project would take longer to complete.

Traffic

  • We may need to reduce traffic to a single lane during construction.
  • If we have to reroute traffic, we will place signs giving directions.
  • On-street parking will be reduced during construction.

Driveway Access

  • Due to construction activities, we may need to block your driveway for a short time. We will contact you before we do this to arrange for the best time and for alternate access, if needed. If your driveway is blocked, you may choose to park on a side street for a short time. If you need immediate access to your driveway, the contractor will have road plates available to quickly allow access in and out of your driveway.
  • We will make sure businesses have access at all times.
  • Please call the Project Manager if you have special needs related to access or business hours.

Trimming Trees

  • If tree branches within the right-of-way interfere with construction, the contractor will have the trees pruned before equipment enters the drip line of the tree.
  • If tree branches on private property interfere with construction, they will be pruned back to the nearest suitable trunk, crotch or branch.
  • The contractor will ask you for permission before cutting any branches on private property. If you do not allow the contractor onto your property to trim the branches, the branches will be cut vertically at the property line.

Interrupting Your Water Supply

  • It is our goal to let you know 48 hours (2 days) in advance if we need to shut off your water. Occasionally, we may have to reduce this notice to 24 hours.
  • If we have to shut off your water because of an emergency, we will do everything we can to fix the problem as quickly as possible.

Vibrations

  • You may feel slight vibrations from the construction work.

Repairing the Road, Curbs, and Sidewalks

  • We will start restoring the road and boulevard once all replacements and service transfers are complete and as weather permits.
  • We will complete the restoration as weather permits.

Project Updates

  • The Region of Peel will always let you know if there are any major changes to the plans.
  • We will try to disturb you as little as possible.
  • Please call the project manager or inspector if you have any concerns or special needs.

Email questions or comments


| Back to Mississauga Construction Projects |

Revised: Friday September 02 2016