Public Works Construction

Construction in Peel: Mississauga

Hot Mix Asphalt Resurfacing
Britannia Road West from 407 ETR to Winston Churchill Boulevard
Project # 15-4653

We have finished the work. The project is under warranty until September 2017.

Project Description

The Region of Peel will be carrying out the resurfacing of Britannia Road West from 407ETR to Winston Churchill Boulevard, City of Mississauga. The work to be done includes, but is not limited to, cold milling, grading, hot mix paving, removal and replacement of curbs, repairs and adjustments to structures, placement of pavement markings, restoration, and minor related works. See map (PDF, 75KB).

Schedule

Construction is scheduled to start mid-July 2015 and we anticipate completion of the works by mid-October 2015, weather permitting.

Contact Persons

The works will be performed by Pave-Al Ltd. Contact names and telephone numbers are listed below:

Region of Peel Personnel
Contact Person Responsibilities Telephone Number
Jerry Tan Project Manager 905-791-7800 ext. 7916
George Da Re Regional Inspector 905-791-7800 ext. 3246
Contractor Personnel (Pave-Al Ltd.)
Contact Person Responsibilities Telephone Number
David Boccia Project Manager 905-256-2500
John Campoli Site Supervisor 416-676-4296

Working Hours

Crews will do the main works during the day from 9:00 am to 6:00 pm but will do some paving works at night from 7:00 pm to 6:00 am. We apologize for any inconvenience this may cause.

Traffic Control

We will make every effort to minimize disruption to traffic, access to businesses and residential area while still maintaining a safe working environment as required under the Occupational Health and Safety Act. However, due to the nature of the work we will need to reduce traffic to a single lane (each direction) and temporarily block intersections during construction.

Driveway Access

It is anticipated that driveway access will be maintained in so far as possible during the works. If driveway access needs to be temporarily blocked, residents and/or businesses will be contacted to arrange for the best time to undertake the required operations.

Project Updates

The Region of Peel is committed to keeping you informed and ensuring that the works are carried out with minimum disruption. If there are any substantial changes in the project scope or schedule, you will be provided with project updates. We also encourage you to notify the appropriate contact person to advise them of any problems or particular needs. We thank you in advance for your cooperation and patience during the construction of this project.

 

Email questions or comments

| Back to Mississauga Construction Projects |

Revised: Wednesday March 30 2016