A-Z List | Accessible Info | Careers | Contact Us

 
--
Images from Peel Region
Public Works on Twitter
Google Translate Feedback
Was this translation useful?
Yes No
Comments on translation:

Thank you for your feedback!
Public Works Construction

Construction in Peel: Mississauga

Construction of the Sanitary Sewer on Jarvis Street and Dundas Street West
Project 15-2300-C2

The Region of Peel has been working in your neighbourhood to construct a new sanitary sewer to redirect the local flow from Jarvis Street to the existing local sanitary sewer located on Dundas Street West.

Noise Control By-Law Exemption

The City of Mississauga has granted a Noise Control By-Law exemption to allow Ward and Burke Microtunneling Ltd. overnight work for tunnel mining, with the exception of Saturday night and Sunday. Continuous microtunneling is preferred for the successful and safe micro-tunneling machinery operation. A 24 hour micro-tunneling operation is common for this type of project and has been utilized successfully in other areas of Mississauga on other Peel Capital projects. The extended working hours are from 7:00pm to 7:00am from Monday to Saturday. To mitigate evening and overnight noise, Ward and Burke will operate a generator from an insulated enclosure and will eliminate any truck movement in and out of the site. The construction is ongoing underground and as such generates minimal additional noise and impact to adjacent residences. The continuous construction operation is expected to last until April 30, 2017.

Temporary Road Closures

The City of Mississauga has approved temporary road closures for the intersections of Jarvis St. with Thompson St. and Jarvis St. with Dundas St. W. The noted road closures are required to provide sufficient laydown area for the microtunneling equipment required to safely construct the sanitary sewer. The durations of the temporary road closures will be as follows:

  • Intersection of Jarvis St. with Thompson St. from Jan 9, 2017 to April 30, 2017.
  • Intersection of Jarvis St. with Dundas St. W from Jan 11, 2017 to May 31, 2017.

Project Updates

The Region of Peel is committed to keeping you informed and ensuring that the work is carried out with minimum disruption. If there are substantial changes in the project scope or schedule, we will provide you with further updates.

Contact

The Region of Peel encourages you to notify the project manager listed below if you have special requirements, comments or concerns.

Please use project number 15-2300-C2 when contacting us:

Olena Gordiyenko
Project Manager
Wastewater Division
905-791-7800, ext. 7843

Or alternatively:

Suzie Bizarro
Contract Administrator
Associated Engineering (Ont.) Ltd.
416-622-9502, ext. 233

| Back to Mississauga Construction Projects |

Revised: Thursday December 15 2016

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text