Public Works Construction

Construction in Peel: Mississauga

Hot Mix Asphalt Resurfacing on Winston Churchill Boulevard from Royal Windsor Drive to Dundas
Street West
Project# 16-4665

We have finished the work. The project is under warranty until May 2019.

Project Description

In partnership with Halton Region, the Region of Peel will be carrying out the resurfacing of Winston Churchill Boulevard from Royal Windsor Drive to Dundas Street West to improve asphalt performance. The work to be done includes, but is not limited to, cold milling, grading, hot mix paving, removal and replacement of curbs, repairs and adjustments to structures, placement of permanent thermoplastic pavement markings, restoration, and minor related works. Construction map.

Schedule

The work is scheduled to commence on or about June 20, 2016 and we anticipate completion of the works by the end of October, weather permitting.

Working Hours

The Contractor’s working hours are from 7AM to 6PM, Monday to Friday. The Contractor is permitted to work on Saturdays if they choose to.

Due to complexity of the proposed work, schedule for all asphalt removal and paving is as follows:

  • from Royal Windsor Drive to Bromsgrove Road: the work will be completed at night, from 7PM to 7AM
  • from Bromsgrove Road to QEW: the work will be completed during the day, from 7AM to 7PM
  • from QEW to Dundas: the work will be completed at night, from 7PM to 7AM

Contact Persons

The works will be performed by Gazzola Paving Limited. The contact names and telephone numbers are listed below.

Region of Peel Personnel
Contact Responsibilities Phone Number
Serguei Kabanov Project Manager 905-791-7800 ext. 8754
Marc Vaccari Construction Inspector 905-791-7800 ext. 3246/47
Contractor Personnel (Gazzola Paving Limited)
Contact Responsibilities Phone Number
Jerry Mclaughlin Project Manager 416-675-7007
Mike Monardo Superintendent 416-684-5040
Halton Region Personnel
Contact Responsibilities Phone Number
Gianvito Monaco Project Manager 905-825-6000 ext. 7220

Traffic Operations

The works will be staged to minimize disruption to traffic and businesses. Some major work will be undertaken at night time. Temporary lane closures will be required during non-peak hours. We will be required to reduce traffic to a single lane (each direction) and temporarily block intersections during construction. Peel Regional Police will be present to direct traffic safely. Emergency access will be maintained at all times. Barriers and signage will be erected to direct traffic safely through the construction zone, as required under the Occupational Health and Safety Act.

Project Updates

Halton Region and the Region of Peel are committed to keeping you informed and ensuring that the works are carried out with minimum disruption. If there are any substantial changes in the project scope or schedule, you will be provided with project updates. We also encourage you to notify the appropriate contact person to advise them of any problems or particular needs. We thank you in advance for you cooperation and patience during the construction of this project.

Project Update #9 Sept. 24

Please be advised that Gazzola Paving is scheduled to complete WEEKEND Paving Operations at Winston Churchill Boulevard and Royal Windsor Drive Intersection, in all directions, starting Saturday, September 24 at 07:00AM, weather permitting. The work will include placement of final top asphalt and permanent line painting.

September 24 DAY (07:00AM to 7:00PM) Southbound, Northbound, Eastbound and Westbound Royal Windsor Drive Intersection TOP ASPHALT

Email questions or comments

| Back to Mississauga Construction Projects |

Revised: Monday April 24 2017

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text