Public Works Transportation Environmental Assessments

Environmental Assessments: Brampton

Mississauga Road Improvements – 2 project locations

Location 1 – Mississauga Road from Financial Drive to Queen Street West

Location 2 – Mississauga Road from Queen Street West to Bovaird Drive West

The need for both studies has been identified in the Region’s Long Range Transportation Plan 2012 Update.

The Location 1 study will examine the need, justification and feasibility of improvements such as road widening, changes to road and intersection design and pavement rehabilitation. It will be conducted as a Schedule C project as described in the Municipal Engineers Association’s Municipal Class Environmental Assessment (EA) document (2011).

The Location 2 study will be conducted as a Study Addendum to the completed 2006 Municipal Class EA for Mississauga Road from Queen Street West to Bovaird Drive. The original study identified the need for improvements and the Study Addendum will re-evaluate the proposed scope of work based on updated traffic projections.

Both studies will review opportunities to facilitate transit, walking and cycling.

General information for both locations will be posted under Study Documents. Information specific to each location will be posted separately.