A-Z List | Accessible Info | Careers | Contact Us

 
Images from Peel Region
Public Works on Twitter
Google Translate Feedback
Was this translation useful?
Yes No
Comments on translation:

Thank you for your feedback!
Public Works Transportation Environmental Assessments

Environmental Assessments: Brampton

Highway 50 from Castlemore Road/Rutherford Road to Mayfield Road/Albion-Vaughan Road and Mayfield Road from Highway 50 to Coleraine Drive

The Region of Peel has completed the Schedule “C” Environmental Assessment (EA) to:

  • analyze and evaluate current and future transportation demands for the year 2031 on Highway 50 and Mayfield Road, and,
  • address operational and servicing deficiencies, standard intersection geometrics, road link capacity and storm drainage.

Details of the EA can be viewed below in the Environmental Study Report.

Study Documents

Appendices are as follows:

Appendix A – Preferred Design

Appendix B – Agency Consultation

Appendix C – Public Consultation

Appendix D – First Nations

Appendix E – Study Reports

Appendix F – Utility Plans

Appendix G – Cost Estimate

Back to Current Environmental Assesments

Revised: Monday June 26 2017

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text