A-Z List | Accessible Info | Careers | Contact Us

 
Images from Peel Region Public Works on Twitter
Public Works Transportation Environmental Assessments

Environmental Assessments: Brampton

Archived Page

This page is online for reference purposes only. This page will not be altered or updated in the future. Contact us to request an alternate format of the content in this page.

Highway 50 from Castlemore Road/Rutherford Road to Mayfield Road/Albion-Vaughan Road and Mayfield Road from Highway 50 to Coleraine Drive

The Region of Peel has completed the Schedule “C” Environmental Assessment (EA) to:

  • analyze and evaluate current and future transportation demands for the year 2031 on Highway 50 and Mayfield Road, and,
  • address operational and servicing deficiencies, standard intersection geometrics, road link capacity and storm drainage.

Details of the EA can be viewed below in the Environmental Study Report.

Study Documents

Appendices are as follows:

Appendix A – Preferred Design

Appendix B – Agency Consultation

Appendix C – Public Consultation

Appendix D – First Nations

Appendix E – Study Reports

Appendix F – Utility Plans

Appendix G – Cost Estimate

Back to Current Environmental Assesments

Revised: Wednesday August 01 2018

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text