What is an Energy from Waste (EFW) Facility? |
Environmental Controls | Facility Operations | Tipping Floor |
Two Stage Incinerators | Air Pollution Control (APC) |
Ash Removal & Disposal | Ash Used in Asphalt |
Algonquin Power Liaison Committee
Algonquin Power Liaison Committee

What is the Algonquin Power Liaison Committee?
- The committee includes volunteers from Brampton, Mississauga and Caledon, representatives from Algonquin Power and staff from the Region of Peel (Region) and the Ministry of the Environment (MOE).
- Chaired by Jayne Pilot, Certified Environmental Auditor (CEA), President of Pilot Performance Resource Management Inc.
- Since 1992, the Liaison Committee meets regularly during the year, to discuss plant performance, annual compliance testing, new technologies and potential concerns.
What is the purpose of the Committee?
- The Liaison Committee educates Peel residents about the facility and its operations.
- The Liaison Committee provides feedback from the residents to Algonquin Power and staff from the Region and MOE.
- Reviews reports from the facility, Region and the MOE.
Next Meeting
Tuesday, May 22, 2012 at 6 p.m.
Algonquin Power Energy from Waste Facility
7656 Bramalea Rd
Brampton, ON L6T 0B6
Contact Information
Jayne Pilot
Committee Chair
Tel: 905-792-3130
Fax: 905-792-3047
E-mail: jpilot@pilotims.com