Zone 6 Reservoir and Feedermain Class
Environmental Assessment

The Region of Peel has initiated a Class Environmental Assessment (Class EA) for the proposed construction of the Zone 6 Reservoir and Feedermain. The June 2007 Region of Peel Water and Wastewater Master Plan Update identified the need for fire and emergency water storage, using facilities not dependent on a pumped water supply, to service the areas of North Brampton and Mayfield West (known as the Zone 6 Water Distribution Area). This would require the use of elevated tanks or in-ground reservoirs.

The study is being conducted according to the requirements outlined under the Municipal Engineer’s Association Municipal Class Environmental Assessment (EA) (October 2000, and as amended in 2007), which is a planning process approved under the Ontario Environmental Assessment Act. This project has been classified as a Schedule C project and will include public and review agency consultation, evaluation of alternative solutions, possible locations for the storage facility and the associated pipes, an assessment of the potential environmental effects of the proposed project and alternatives, and identification of reasonable measures to mitigate any adverse impacts that may result from the proposed project.

Through the Class Environmental Assessment planning process, the Region will carry out the following:

  • Evaluate location and size of the tank/reservoir
  • Determine the future Feedermain capacity and servicing areas
  • Determine the alignment of the feedermain
  • Assess the environmental impacts of the project
  • Identify measures to mitigate any adverse impacts

Public consultation is vital to this Study. We want to ensure that anyone with an interest in this Study has the opportunity to get involved and provide input before any decisions are made on the preferred solution.

Notice of Study Commencement #1

Notice of Public Open House #1

PIC Boards #1

Reports #1

Notice of Public Open House #2

PIC Boards #2

Reports #2

Notice of Public Open House #3

PIC Boards #3

Environmental Study Report

Notice of Study Completion

Contact Information

Please contact the following with your comments or if you wish to be added to the project mailing list or if you require any additional information:

Italia Ponce, P.Eng.
Project Manager
Program Planning and Compliance, Water Division
Region of Peel
10 Peel Centre Dr.
Brampton, ON L6T 4B9
Tel: 905-791-7800, ext. 4583
italia.ponce@peelregion.ca

[ Back to Current Environmental Assessments ]





Revised: Monday November 21 2011

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text