Water Quality in Peel
2006 Annual Summary Report
The 2006 Annual Summary Report addresses the requirements outlined in Schedule 22 of the Ontario Drinking Water Systems Regulation (170/03, amended to 402/06) under the Safe Drinking Water Act (SDWA), 2002.
The report includes a statement of compliance and non-compliance of the Region of Peel drinking water systems with terms and conditions of the Certificates of Approval, Permits to Take Water, Drinking Water Quality Standards Regulation (O.Reg. 169/03, amended to 248/06), and the Ontario Drinking-Water System Regulation 170/03. The report also contains a summary of the quantities and flow rates of water supplied, including monthly average and maximum daily flows and daily instantaneous peak flow rates during the period from January 1st to December 31st, 2006.
In addition, the Annual Summary Report includes the 2006 Drinking Water System Annual Reports for all of Peel’s waterworks systems submitted to the Ministry of the Environment (MOE), in accordance with Section 11 of O. Regulation 170/03, a summary of 2006 water quality inquiries within the Region of Peel, and planned water quality initiatives and upcoming projects.
- Executive Summary (PDF 17KB, 3 pgs)
- Statement of Compliance and Non-Compliance (PDF 21KB, 4 pgs)
Water Flows
- South Peel Lake-Based System (PDF 73KB, 15 pgs)
- North Peel Groundwater Waterworks (PDF 1MB, 44 pgs)
2006 Annual Reports
- Lakeview Water Treatment Plant (PDF 72KB, 11 pgs)
- Lorne Park Water Treatment Plant (PDF 68KB, 11 pgs)
- Alton Well Supply (PDF 207KB, 11 pgs)
- Caledon East (PDF 53KB, 8 pgs)
- Caledon Village (PDF 166KB, 10 pgs)
- Cheltenham Village Supply (PDF 119KB, 8 pgs)
- Inglewood (PDF 164KB, 9 pgs)
- Palgrave Well Supply (PDF 52KB, 9 pgs)
- Drinking Water Systems Certificates of Approval and Permits to Take Water (54KB, 5 pgs)
- Organizational Structure (PDF 134KB, 1 pg)
- Customer Water Quality Inquiry Summary (PDF 320KB, 3 pgs)
- Planned Water Quality Initiatives (PDF 29KB, 4 pgs)