Public Works Construction

Construction in Peel: Brampton

Downtown Brampton Capital Project Phase 1

Project Numbers 11-2380 and 08-1310

What are we doing?

The Region of Peel, in coordination with the City of Brampton's future streetscaping program, is beginning phase 1 of a multi-year project that will replace aging infrastructure, replace and reline existing sanitary sewers, as well install new watermains and sanitary sewers.

This first phase focuses on the following downtown Brampton streets, however, the overall project will extend from Vodden Street to Harold Street and Centre Street to McLaughlin Road.
Please see attached map (PDF, 1MB)
.

  • Queen Street – Mill Street to Centre Street
  • Main Street – Church Street to south of Wellington Street
  • Chapel Street – Queen Street to Peel Street
  • Moore Crescent; Mary Street – Queen Street to Moore Crescent
  • Elizabeth Street – Queen Street to Wellington Street
  • George Street – Queen Street to 50 metres south

Why?

To upgrade and improve existing water and wastewater services in downtown Brampton. Wastewater comes from flushing toilets, having a shower or washing dishes. Sanitary sewer pipes take wastewater from homes or businesses to a treatment plant.

When?

Phase 1 of the construction is anticipated to start in the spring of 2018.

Business and Institutional Care Program

As part of the preplanning for this work, a Business and Institutional Care Program (BICP) has been started to help ensure businesses in the downtown core can continue to operate normally during construction.

Project Ambassadors

The Project Ambassadors are the first point of contact for businesses and will be available throughout the construction to answer questions and provide updates.

Project Ambassador
Heather Frost
heather.frost@brampton.ca
416-271-4726
Project Ambassador
David Abreu
david.abreu@peelregion.ca
416-274-9164

Project timelines

2016

Multiple preplanning surveys; Environmental Assessment that includes public consultation about downtown streetscape (starting in fall and into spring of 2017)

2017

Finalize design of construction; tender process in late 2017 for contractor

2018

Phase 1 construction begins (spring)

2019

Streetscape improvements

Downtown Brampton Streetscaping

The City of Brampton has initiated a Class Environmental Assessment for streetscaping the downtown to create an aesthetically beautiful environment to boost the image and awareness of the downtown revitalization efforts. The main objectives are to create a complete street that will capitalize the walkability and pedestrian capacity downtown, to animate these streets, and to become a place making destination capturing the heart of Bramptonians and visitors.

Public Information Centre #2

Thursday, April 27, 2017
(Drop-in-Centre Format)
6:30 p.m. to 8:30 p.m.
Rose Theatre - Studio Room
1 Theatre Lane, Brampton

Project updates

The Region of Peel will always let you know if there are any major changes to the plans. We will try to disturb you as little as possible.

Who can you call?

For any questions or special requirements related to the project please call the project manager:

Simon Hopton, P.Eng.
Manager, Capital Works, Wastewater Division
905-791-7800, ext. 7808

| Back to Brampton Construction Projects |

Revised: Monday April 17 2017

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text