Peel Region homepage
Peel Region
Go
main

Watermain Replacement and Improvement

Indian Grove. Project 13-1347 H1

The Region of Peel will be repairing the road where it was disturbed by our recent watermain construction.

Schedule

We expect paving activities to take place on Indian Grove between July 21, 2022 and July 29, 2022, weather permitting. This includes both the street and asphalt driveway restoration.

Regular working hours will be between 7 a.m. and 7 p.m., Monday to Friday.

We will provide more detailed timelines through email. Receive these timely updates by signing up for e-notices at peelregion.ca/construction

Driveway access

You may not have access to your driveway for a short time as the paving operation crosses your driveway.

Road access

Work will be phased to minimize traffic disruption in the area.

Parking

Please do not park on the street from 7 a.m. to 7 p.m. during the above dates. Please ensure the road is cleared of vehicles (and any type of materials) at these times.

Before paving operations, you may be asked to park outside the active work area. Residents are asked to coordinate with the contractor before parking on the street to ensure vehicles are not blocking equipment and operations. Please note that all parking laws remain in place, including proper clearance from hydrants and stop signs.

Safety during construction

Construction zones require extra caution to keep everyone safe pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. To learn more about how to stay safe in construction zones, visit peelregion.ca/construction/workzonesafety

Keeping you informed

Receive timely updates right to your inbox by signing up for e-notices at peelregion.ca/construction Information on this project can also be found at peelregion.ca/pw/construction/miss/131347H.htm

We apologize for any inconvenience. Thank you for your cooperation while we finish this work.

If you have any questions, please contact us.

Water Linear Engineering and Reliability,
Engineering Services Division
Public Works,
Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409