Watermain replacement
Mississauga Road, Beaufort Terrace and Eckland Court. Project 18-1310A.
What are we doing?
- Reinstating driveways, sod, sidewalk, and curb following the replacement of the watermain and services along Mississauga Road, Beaufort Terrace, and Eckland Court.
- To complete restoration following upgrade of the water distribution system.
When?
- We expect to start work on or about June 14, 2021.
- The project should be completed before October 2021.
Who you can call
Region of Peel | ||
Contact Person | Responsibilities | Telephone Number |
---|---|---|
Rene Gomez | Project Manager | 905-791-7800, ext. 3809 |
Stan Domanski | Inspector | 905-791-7800, ext. 3246 |
Four Seasons SiteDevelopment Four Seasons Site Development will do the work, under contract to the Region of Peel |
||
Sanjay Bansal | Project Manager | 1-416-745-0707 |
Flemming Stidsen | Site Superintendent | 1-416-745-0707 |
Traffic and parking control
- We may need to reduce traffic to a single lane during construction.
- If we have to reroute traffic, we will place signs giving directions.
Driveway access
- Due to construction activities, we may need to block your driveway for a short time. We will contact you before we do this to arrange for the best time and for alternate access, if needed.
- We will make sure businesses have access at all times.
- Please call the Project Manager if you have special needs related to access or business hours.
Replacing and taking care of your sod
- The contractor will take care of any sod we replace for 30 days.
- You can help the sod to stay healthy by watering it for one hour in the early morning, two or three times a week. This is especially important in hot or dry weather.
- We will replace your sod as soon as we can, but there may be a short delay due to weather.
- It is very common for the work area to settle a bit following construction. If you notice any settlement, please let the project manager or inspector know and we will ensure the contractor fixes it.
Repairing your driveway
- The City of Mississauga has scheduled Mississauga Road, Beaufort Terrace, and Eckland Court for road rehabilitation in 2022, pending Council approval. During their Roadway Rehabilitation works, a portion of most driveways will be disturbed again along the curb.
- If we damaged a portion of your asphalt driveway, a temporary asphalt patch will be installed by our watermain contractor. Following the City of Mississauga’s work, your driveway will be replaced in the disturbed area from edge to edge across the driveway.
- We will repair your driveway as soon as we can, but there may be a short delay.
Repairing the road, driveway aprons, curbs, and sidewalks
- All sections of curbs impacted by the watermain construction will be temporarily restored with asphalt this year.
- All sidewalk bays impacted by the watermain construction shall be permanently restored this year.
- The impacted roadway in your neighborhood will be restored with new asphalt over the watermain trench width only.
- As part of the overall improvement in your neighborhood, the City of Mississauga has scheduled Mississauga Road, Beaufort Terrace, and Eckland Court for road rehabilitation in 2022, pending Council approval. They will complete permanent restoration then.
Project updates
- The Region of Peel will always let you know if there are any major changes to the plans.
- We will try to disturb you as little as possible.
- Please call the project manager or inspector if you have any problems or special needs.