Watermain replacement and improvement
Edenwood Drive & Fullerton Crescent. Project 21-1310 K
What are we doing
- Placing the top course of asphalt on the road over the watermain trench along Edenwood Drive and Fullerton Crescent.
- Paving base and top course along sections of Fullerton Crescent.
When?
- The first phase of base paving has now been completed outside of a small section on Fullerton Crescent, which will be completed on Tuesday September 21st.
- The second phase (top asphalt) will be done between Tuesday September 21st and Friday September 24th.
- As this work depends on the weather, these dates may change.
What does this mean for you?
- Please do not park on the road from 7:00am to 7:00pm during the above dates. Please ensure the road is cleared of vehicles (and any type of materials) at these times.
- You may not have access to your driveway for a short time as the paving operation crosses your driveway.
- We appreciate your co-operation during the completion of work and apologize in advance for any inconvenience.
Project updates
- The Region of Peel will always let you know if there are any major changes to the plans.
- We will try to disturb you as little as possible.
- Please contact us if you have any problems or special needs.
Sign up for email notices to stay informed
- Receive timely project updates right to your inbox by signing up for e-notices at peelregion.ca/construction.