Mayfield Road EA from Chinguacousy Road to Winston Churchill Boulevard
The Region of Peel has completed the Schedule “C” Environmental Assessment (EA) for improvements to Mayfield Road from Chinguacousy Road to Winston Churchill Boulevard. Mayfield Road is an east-west arterial road and forms the boundary between the City of Brampton and the Town of Caledon. Winston Churchill Boulevard forms the boundary between the Region of Peel and the Region of Halton. The EA planning process included public and review agency consultation, evaluation of alternatives, assessment of the effects of the proposed works and identification of measures to mitigate any adverse impacts.
For details of the EA see the link below to the Environmental Study Report.
Study Documents
- Comment Sheet (PDF 45KB, 1 page)
- Study Area (PDF 38KB, 1 page)
- Notice of Commencement
- Notice of Public Information Centre #1
- PIC #1 Boards (PDF 3.19MB, 31 pages)
- Policy Context Slides (PDF 4.21MB, 8 pages)
- Notice of Public Information Centre #2 (PDF 341KB, 1 page)
- PIC #2 Boards (PDF 1.84MB, 23 pages)
- Creditview Road - Chinguacousy Road 5 Lane Design (PDF 6.2MB, 1 page)
- Creditview Road - Chinguacousy Road 6 Lane Design (PDF 6.5MB, 1 page)
- Heritage Road - Mississauga Road 4 Lane Design (PDF 6.9MB, 1 page)
- Mississauga Road - Creditview Road 5 Lane Design (PDF 7.5MB, 1 page)
- Mississauga Road - Creditview Road 6 Lane Design (PDF 7.8MB, 1 page)
- Winston Churchill Boulevard - Heritage Road 4 Lane Design (PDF 7.3MB, 1 page)
- Winston Churchill Boulevard and Heritage Road Roundabout Options
(PDF 4.6MB, 1 page)
- Notice of Study Completion
- Environmental Study Report (ESR) Main Document including corridor design
(PDF 14MB, 118 pages)
Reports available in the Appendices are as follows:
Appendix A – Notifications and Contacts
Appendix B – Comments from Stakeholder Engagement
Appendix C – Aboriginal and First Nations Engagement
Appendix D – Traffic Study
Appendix E – Geotechnical Pavement
Appendix F – Drainage and Storm Water
Appendix G – Natural Heritage Assessment
Download Appendix A to G (PDF, 48 MB, 822 pages)
Appendix H – Hydrogeology & Geomorphic Assessment
Appendix I – Contaminated Soil
Appendix J – Archaeology
Appendix K – Cultural Heritage
Appendix L – Noise
Appendix M – Air Quality
Appendix N – Technical Advisory Committee
Appendix O – Geometric Review
Appendix P – Public Information Centres
Download Appendix H to P (PDF, 75 MB, 631 pages)
This EA has been finalized and the project has now moved into the next phase ‘Detailed Design & Construction’
For questions or inquiries, please contact:
Mayfield Road from Chinguacousy Road to Mississauga Road
Serguei Kabanov
Project Manager
Roads – Design and Construction
Tel: 905-791-7800 ext. 8754
Mayfield Road from Mississauga Road to Winston Churchill Boulevard
Ommar Moeen
Project Manager
Roads – Design and Construction
Tel: 905-791-7800 ext.7998
Back to Current Environmental Assesments