Public Works Construction

Construction in Peel: Brampton

Various Streets in Brampton
Project 16–2300–F

Project Facts

Pipe size:
250mm (10 inch) and 300mm (12 inch) sanitary sewer pipes and maintenance holes

Construction type:
Trench excavation and restoration work

Noise level:
Low to Moderate

Contractor:
Gio Contracting Inc.

Area sketch (PDF)

The Region of Peel will be working in your neighborhood to upgrade the existing sewer systems capacity and reliability in the area, see map (PDF). Wastewater comes from flushing toilets, having a shower or washing dishes. Sanitary sewer pipes take wastewater from homes or businesses to a treatment plant.

The work will take place on the following streets:

  • Abbey Road from Pleaseley Road to Harper Road
  • Pleaseley Road from Abbey Road to Harper Road
  • Harper Road from Cornwall Road to Bartley Bull Parkway
  • Benton Street from Dean Street to Tullamore Road

Preconstruction Surveys

The Region of Peel's contractor, Gio Contracting Inc. and WHS Consulting Firm, will be completing photographic pre-construction surveys to record the exterior/interior condition of existing buildings and structures, environmental features, and road surface conditions along the sanitary sewer alignment.

A representative from WHS will knock on your door prior to doing any survey of your property. There is no cost to you for the survey, and you are not obligated to have it completed, however we do recommend it. The survey protects you, the Region of Peel and the contractor working on behalf of the Region in the unlikely event of a claim due to construction. This survey is common practice on most construction projects and will take place over the next couple of weeks, weather permitting.

Reducing the Impact of Construction

  • The work will be phased to minimize traffic disruption in the area
  • Regular working hours will be between 7 a.m. and 7 p.m., Monday to Friday
  • We will let you know if there are any substantial changes to the project

Safety

The Region of Peel provides a safe environment that conforms to the Occupational Health and Safety Act, at all times.

Schedule

Project construction is expected to start on Harper Road in September and be substantially completed by the end of November 2017. Final restoration work will follow immediately and be completed within four to six weeks, again weather permitting.

Contact

The Region encourages you to notify us if you have special requirements, or if you have any comments or concerns. Please contact:

Joanna Pietkiewicz
Project Manager
Wastewater Division
905-791-7800, ext. 7815


| Back to Brampton Construction Projects |

Revised: Monday June 26 2017

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text