Public Works Construction

Construction in Peel: Mississauga

Hot Mix Asphalt Resurfacing on Derry Road West
From Danton Promenade to Copenhagen/Montevideo Road
Project# 15-4635

We have finished the work. The project is under warranty until September 2017.

Project Description

The Region of Peel will be carrying out the resurfacing of Derry Road from Danton Promenade to Copenhagen Road/Montevideo Road, City of Mississauga. The work to be done includes, but is not limited to, cold milling, grading, hot mix paving, removal and replacement of curbs, repairs and adjustments to structures, placement of pavement markings, restoration, and minor related works. See map (PDF, 90KB).

Schedule

Construction is scheduled to start mid-July 2015 and we anticipate completion of the works by mid-October 2015, weather permitting.

Contact Persons

This project will be constructed by Furfari Paving Co. Ltd. and inspected by Region Staff. Contact information and phone numbers are listed below:

Region of Peel Personnel
Contact Responsibilities Phone Number
Jerry Tan Project Manager 905-791-7800 ext. 7916
Sasho Pulevski Regional Inspector 905-791-7800 ext. 3246
Contractor Personnel
Contact Responsibilities Phone Number
Joey Furfari Project Manager 416-293-1369
Tony Defina Site Supervisor 416-717-7814

Working Hours

Our contractor's normal working hours are from 9:00am to 7:00pm to allow for a shorter construction period. We apologize for any inconvenience this may cause.

Traffic Control

We will make every effort to minimize disruption to traffic, access to businesses and residential area while still maintaining a safe working environment as required under the Occupational Health and Safety Act. However, due to the nature of the work (milling and paving) we will need to reduce traffic to a single lane (each direction) and temporarily block intersections during construction.

Driveway Access

It is anticipated that driveway access will be maintained in so far as possible during the works. If driveway access needs to be temporarily blocked, residents and/or businesses will be contacted to arrange for the best time to undertake the required operations.

Project Updates

The Region of Peel is committed to keeping you informed and ensuring that the works are carried out with minimum disruption. If there are any substantial changes in the project scope or schedule, you will be provided with project updates. We also encourage you to notify the appropriate contact person to advise them of any problems or particular needs. We thank you in advance for your cooperation and patience during the construction of this project

 

Email questions or comments

| Back to Mississauga Construction Projects |

Revised: Wednesday March 30 2016

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text