Water & Wastewater
Hanlan Feedermain and Mississauga City Centre (MCC) Watermain
- Frequently Asked Questions
- Maps of the Recommended Routes and Route Alternatives
- Download Hanlan Feedermain Environmental Study Report
- Download Mississauga City Centre Watermain Environmental Study Report
The Region of Peel is undertaking a Municipal Class Environmental Assessment (EA) Study for implementation of the proposed Hanlan Feedermain, and more recently, the proposed Mississauga City Centre (MCC) Watermain.
This project involves selection of the preferred route(s) for two new large diameter municipal drinking water pipes. The proposed Hanlan Feedermain will start at the Lakeview Water Treatment Facility and extend north to the Hanlan Pumping Station and Reservoir located at Britannia Road and Tomken Road.
The new Hanlan Feedermain will:
- Provide additional security for water supply
- Provide sufficient capacity to meet growth in the eastern section of Peel
- Meet projected demands associated with the City of Mississauga’s planned intensification
- Reduce the operating hydraulic gradeline for the Zone 2 High Lift Pumping Station, resulting in the ability to more easily move water
The proposed MCC Watermain will start at the Hanlan Pumping Station and Reservoir and extend south to a connection point on the existing distribution system in the Burnhamthorpe Road area. This project is required for intensification in the City of Mississauga, specifically to supply minimum pressures along the Hurontario Street corridor.
AECOM is the consultant managing this project on behalf of the Region of Peel.
A number of options for the alignment of both the proposed Hanlan Feedermain and MCC Watermain (maps) have been reviewed and presented to interested or affected individuals and agencies through two rounds of Public Open Houses. The preferred routes, which may or may not follow the same alignment, will be selected based on the input of key stakeholders such as the City of Mississauga, Conservation Authorities, utilities, community groups and residents etc. Every effort will be made to minimize the impact on sensitive areas.
Design is expected to begin in 2010 with construction beginning in 2012 (although some sections could be advanced for construction with other approved capital works).

Maps of the study area, recommended routes and route alternatives
Newsletters
Spring 2009 Newsletter (PDF 2.7 MB, 2 pages)
Spring 2010 Newsletter (PDF 1.0 MB, 6 pages)
Notice of Study Commencement
Notice of Study Commencement Hanlan Feedermain (PDF 150KB, 1 pg)
Public Open House #1 (June 3rd and 4th 2008)
Public Open House #1 Summary Report (PDF 2 MB, 20 pages)
Display Boards (PDF 3.3MB, 29 pages)
Notice of Public Open House #1 (PDF 277KB, 1 pg)
Public Open House # 2 (June 2nd and 3rd 2009)
Public Open House #2 Summary Report (PDF 1.7 MB, 29 pages)
Display Boards Complete Set (PDF 7.0MB, 51 pages)
Introduction & Background Information
(PDF 592 KB, 8 pages)
Study Area Considerations (PDF 743 KB, 3 pages)
Overview of Alternative Routes Evaluation
(PDF 657 KB, 5 pages)
Overview of the Recommended Routes
(PDF 1.5 MB, 4 pages)
Rationale for the Recommended Routes
(PDF 713 KB, 9 pages)
Interconnections - Burnhamthorpe Library
(PDF 548 KB, 3 pages)
Construction Methods, Compounds & Cross-Sections
(PDF 581 KB, 5 pages)
Timing, Costs & Funding (PDF 67 KB, 1 pg)
Traffic Management (PDF 1.9 MB, 9 pages)
Mitigation Measures & Next Steps (PDF 109 KB, 4 pages)
Comment Sheet (PDF 36 KB, 4 pages)
Notice of Public Open House #2
Notice of Revised Project Description
Notice of Revised Project Description MCC Watermain (PDF 250 KB, 1 pg)
Notice of Study Completion
Notice of Study Completion Hanlan Feedermain
Notice of Study Completion MCC Watermain
Related Documents
Municipal Class Environmental Assessment Environmental Study Report (PDF, 6 MB, 204 pages)Appendix A - Overview of the Municipal Class EA Planning Process (PDF 104 KB, 3 pages)
Appendix B - Planning Information (4.3 MB, 51 pages)
Appendix C - Ecological Field Investigations (5.8 MB 35 pages)
Appendix D - Geotechnical and Hydrogeological Investigations (2.2 MB, 41 pages)
Appendix E - Archaeological and Cultural-Built Heritage Assessments Appendix F - Evaluation Tables (PDF 3.4 MB, 58 pages)
Appendix G - Land Use Photos (PDF 2.6 MB, 25 pages)
Appendix H - Consultation and Communications Report
- Part 1 (PDF 3.7 MB, pages 1-72)
- Part 2 (PDF 8.6 MB, pages 73-146)
- Part 3 (PDF 1.9 MB, pages 147-215)
Appendix J - Traffic Impact Analysis and Construction Staging Drawings (PDF 3.3 MB, 49 pages)
Appendix K - Agency and First Nations Consultation
- Part 1 (PDF 2.4 MB, pages 1-67)
- Part 2 (PDF 6.1 MB, pages 68-135)
- Part 3 (PDF 7.4 MB, pages 136-200)
- Part 4 (PDF 9.4 MB, pages 201-265)
- Part 5 (PDF 8.7 MB, pages 266-336)
MCC Watermain Municipal Class EA Environmental Study Report
MCC Watermain Environmental Study Report - (PDF 6.5 MB, 95 pages)
Appendix A Overview of the Municipal Class EA Planning Process - (PDF 167KB, 3 pages)
Appendix B Planning Information - (PDF 4.4 MB, 25 pages)
Appendix C Natural Environmental Investigations - (PDF 87KB, 7 pages)
Appendix D - Geotechnical and Hydrogeological Investigations
- Part 1 - (PDF 336 KB, 4 pages)
- Part 2 - (PDF 2.1 MB, 42 pages)
- Part 3 - (PDF 3.5 MB, 58 pages)
- Part 4 - (PDF 6.9 MB, 54 pages)
- Part 5 - (PDF 9.8 MB, 34 pages)
- Part 6 - (PDF 6.5 MB, 122 pages)
Appendix E Archaeological and Cultural/Built Heritage Assessments
Appendix F Evaluation Tables - (PDF 361KB, 16 pages)
Appendix G Land Use Photos - (PDF 1.0 MB, 8 pages)
Appendix H Permanent and Temporary Easement
Requirements - (PDF 2.0 MB, 7 pages)
Appendix I Traffic Impact Assessment and Construction Staging - (PDF 734KB, 14 pages)
Documents
Appendix J Agency Consultation and Correspondence - (PDF 361KB, 142 pages)
Appendix K Public Consultation and Communications Report
Contact Information
Please contact the following with your comments or if you wish to be added to the project mailing list or if you require any additional information:
Martin Pendlebury, P. Eng.
Project Manager, Program Planning, Water Division
Region of Peel
10 Peel Centre Dr.
Brampton, ON L6T 4B9
Tel: 905 791-7800, ext. 4548
E-mail questions and comments
[ Back to Current Environmental Assessments ]
Last Updated: March 18, 2010