Public Works Construction

Construction in Peel: Brampton

Twinning of the East Brampton Trunk Sewer
Hwy 407 and Steeles Ave East intersection to Goreway Drive and Queen Street
Project # 11-2201

Ward and Burke Microtunnelling Ltd. (Ward & Burke) on behalf of the Region of Peel will be working on construction of the Twinning of the East Brampton Trunk Sewer in the City of Brampton. See area sketch(PDF, 160KB).

Project facts

Pipe sizes:
1500, 1650, and 1800mm sanitary sewer pipe

Construction Type:
Tunneling, shaft excavation and restoration work

Noise level:
Low to Moderate

Contractor:
Ward and Burke Microtunnelling Ltd.
Drainstar Contracting Ltd.

The project consists of construction of approximately 1,980m of 1800mm diameter, 305m of 1650mm diameter, and 3,000m of 1500mm diameter trunk sanitary sewer to be constructed by tunneling and open cut construction methods along the route shown on the attached map.

Preconstruction survey

Ward and Burke Microtunnelling Ltd. (Ward & Burke), the Region of Peel contractor, will be constructing the new sewer by tunneling. Prior to commencing the construction, OZA Inspections Ltd, a Ward & Burke representative, will be conducting a photographic pre-construction survey to record the condition of the existing buildings and structures, environmental features and the road surface condition within and along the sanitary sewer alignment. OZA Inspections Ltd. will contact you prior to taking photos of your property. There is no cost to you for the survey and you are not obligated to have it completed, however we would recommend it. Pre-construction surveys are standard construction practice. This work will take place over the next couple of weeks, weather permitting. 

Safety

The Region of Peel provides a safe environment that conforms to the Occupational Health and Safety Act, at all times.

Schedule

Construction is anticipated to start at the beginning of March 2017 and is scheduled to be completed by March 2019.

Contact

The Region of Peel encourages you to notify the project manager listed below if you have special requirements, comments or concerns. Please use project number 11-2201 when contacting us.

Olena Gordiyenko
Project Manager
Wastewater Division
905-791-7800, ext. 7843

 

Email questions or comments

| Back to Brampton Construction Projects |

Revised: Wednesday February 15 2017

www.peelregion.ca

Home | Contact Us | Search | A-Z Topic List
Privacy & Terms of Use | Service Commitment

Smaller Text Larger Text