Public Works Construction

Construction in Peel: Brampton

Watermain Installation
Goreway Drive
Project 17-1168S

What are we doing?

  • Installing a new watermain along Goreway Drive from Auction Lane to Intermodal Drive as shown on the attached map.
  • Replacing the water service pipe to your service box.

Why?

  • To upgrade the water system capacity and reliability as part of the Region of Peel’s State of Good Repair program.

When?

  • We expect to start work in October 2017 starting at Goreway Drive and Intermodal Drive.
  • The project should be completed before September 2018. All work is under warranty for two years from the completion date.
  • We will start restoring the road when all water system replacements and transfers are complete, and as weather permits.

Who can you call?

Region of Peel
Contact Responsibilities Phone Number
Scott Durdle Project Manager 905-791-7800 ext. 5052
Tedescon Infrastructure Limited
Tedescon Infrastructure Limited will do the work, under contract to Region of Peel
Contact Responsibilities Phone Number
Reeba Arif Project Manager 647-406-7467
Daniel Szuba Site Supervisor 416-571-4134
Aecom Canada Limited
Aecom will manage and oversee the work, under contract to Region of Peel
Contact Responsibilities Phone Number
Chris Bhawanie Contract Administrator 647-274-6773
Kevin Martin Construction Inspector 416-884-5360

Working Hours

  • Our contractor’s normal working hours are from 7 a.m. to 7 p.m. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but a shorter working day would mean the project would take longer to complete.

Traffic Impacts

  • We will need to reduce Goreway Drive traffic to a single lane during working hours. As work progresses, lanes will be reopened to minimize the impact on traffic.
  • Expect delays and please obey traffic control signs and flag persons when present.

Driveway Access

  • Due to construction activities, we may need to block your driveway for a short time. We will contact you before we do this to arrange for the best time and for alternate access, if needed. If immediate access to your driveway is needed, the contractor will have road plates available to quickly allow access in and out of your driveway.
  • Please call the Project Manager if you have special needs related to access or business hours.

Interrupting Your Water Supply

  • It is our goal to let you know 48 hours (2 days) in advance if we need to shut off your water.
  • If we have to shut off your water because of an emergency, we will do everything we can to fix the problem as quickly as possible.

Waste Collection

  • Your garbage, recycling and organics containers will continue to be picked up on your regularly scheduled day. It is the contractor’s responsibility to move your garbage, recycling and organics bins to a location where our collection vehicles can pick them up. Empty containers will be returned to their corresponding addresses. Please make sure your house number is clearly marked on each bin.

Public Transit

  • Pedestrian sidewalk access on both sides of Goreway Drive will be maintained at all times.
  • Brampton Transit stops may be temporarily relocated when working close to each stop. Please follow posted signs to the nearest alternative or relocated stop location.

Vibrations

  • You may feel slight vibrations from the construction work.

Repairing the Road, Curbs, and Sidewalks

  • We will start restoring the road and boulevard once all replacements and service transfers are complete and as weather permits.
  • We will complete the restoration on a street-by-street basis.

Project Updates

  • The Region of Peel will always let you know if there are any major changes to the plans.
  • We will try to disturb you as little as possible.
  • Please call the Project Manager or Construction Inspector if you have any concerns or special needs.

How Did We Do?

After we’ve finished, we will give you a postage-paid card for you to rate our work.

  • Please complete the card and mail it back to us.

Email questions or comments

| Back to Brampton Construction Projects |