Water & Wastewater
East to West Wastewater Diversion Strategy
The Region of Peel has identified the need to prepare a detailed strategy for the development of sanitary servicing projects in the south east part of Brampton and north east part of Mississauga.
The strategy’s purpose is to divert wastewater flows from the Region’s eastern sanitary trunk system to the western sanitary trunk system which will reduce flows to Lakeview Wastewater Treatment Plant and increase flows to Clarkson Wastewater Treatment Plant. This will balance the collection system and facilities capacities and accommodate planned future growth.
The diversion strategy was identified and recommended through the 2002, 2007 and 2013 Region of Peel Water and Wastewater Servicing Master Plans.
The Region of Peel has initiated this Schedule C Municipal Class Environmental Assessment (EA) study to investigate servicing strategies and individual projects that will require fulfillment through the Municipal Engineer Association (MEA) Class EA process.
Public consultation is vital and key to the success of this study. We want to ensure that anyone interested in this study has the opportunity to get involved and provide input before any decisions are made.
Notice of Study Commencement and Public Information Centres # 1
- Notice of Study Commencement and PICs – April 29 and May 5, 2015
(PDF, 58KB) - Display Boards (PDF, 35MB)
(to download, right click and chose "save link as" or "save target as")
Public Information Centres #2
Public Information Centres #3
Notice of Completion
Appendices
Volume 1
- Appendix A – Screening of Ideas to Concepts (PDF, 694KB)
- Appendix B – Screening of Long List to Short List Concepts (PDF, 1.6MB)
- Appendix C – Evaluation of Preferred Diversion Concepts (PDF, 630KB)
- Appendix D – Evaluation of Preferred Alignment (PDF, 681KB)
- Appendix E – Evaluation of Alternative Shaft Sites (PDF, 3.3MB)
- Appendix F – Property Requirements (PDF, 122MB)
- Appendix G – Preliminary Design Drawings (PDF, 110MB)
- Appendix H – Cost Estimates (PDF, 934KB)
Volume 2
- Appendix A – Communications Plan (PDF, 2.3MB)
- Appendix B – Stakeholder Contact List (PDF, 640KB)
- Appendix C – Study Commencement and Public Information Centre #1
(PDF, 17MB) - Appendix D – Public Information Centre #2 (PDF, 42MB)
- Appendix E – Public Information Centre #3 (PDF, 23MB)
- Appendix F – Study Completion (PDF, 6MB)
- Appendix G – Aboriginal Consultation (PDF, 2MB)
- Appendix H – Government Agencies (PDF, 22MB)
- Appendix I – Conservation Authorities (PDF, 45MB)
- Appendix J – Utilities (PDF, 32MB)
- Appendix K – Community Groups (PDF, 1.5MB)
- Appendix L – Other Agencies (PDF, 973KB)
- Appendix M – Property Owners (PDF, 35MB)
Volume 3
- Appendix A – Geotechnical Reports (PDF, 13MB)
- Appendix B – Initial Hydrogeological Study (PDF, 16MB)
- Appendix C – Preliminary Environmental Risk Report (PDF, 23MB)
- Appendix D – Phase 1 ESA Reports (PDF, 37MB)
- Appendix E – Natural Environmental Ecology Inventory (PDF, 19MB)
- Appendix F – Archeological Assets (Stage 1 & 2) (PDF, 97MB)
- Appendix G – Built and Cultural Heritage Assessment (PDF, 8.5MB)
- Appendix H – Traffic Impact Assessment (PDF, 300KB)
Contact Information
If you have any questions or comments or wish to be added to the mailing list, please contact:
Soyuz Mitra,
Project Manager, Region of Peel
10 Peel Centre Drive, 4th floor, Suite A
Brampton, ON L6T 4B9
905-791-7800 ext. 4550