Drainage Improvements

17940 Airport Road and 17526 Gore Road culvert replacement. Project 20-4885 and 12-4085

Project updates

We have finished the work. The project is under warranty until May 2025

Where the work is happening

On Airport Road at Finnerty Sideroad and on 17526 The Gore Road, Town of Caledon.

What are we doing?

The work includes:

When

Construction Start: August 2022 - Finish: November 2022 (weather permitting)

Working Hours

Hours of operation are from 7 a.m. to 7 p.m., Monday to Friday and work may also be done on Saturdays.

These hours follow the city’s by-laws. Extended working hours may cause some inconvenience to the public however will help facilitate completion of the project as quickly as possible.

The work will be completed by Pacific Paving Limited on the Region’s behalf.

Traffic Control

The project will be phased to minimize traffic disruption while maintaining a safe working environment as required under the Occupational Health and Safety Act.

Due to the nature of the work, a single lane of traffic will be maintained during construction and flag person and temporary signals will be present at all times.

Emergency access will be maintained at all times.

Please use caution when travelling through the work zone.

Driveway Access

We will maintain driveway access as much as possible and should we need to block your driveway for a short time you will be contacted to arrange for the best time

We will make sure businesses have access at all times.

Project Updates

The Region of Peel will keep you informed of any substantial changes in the project scope or schedule.

Please call the project manager if you have any special needs

Who you can call

Randy Chawb-Naraine, P.Eng., C.E.T
Project Manager, Transportation Roads
Transportation Division, Public Works
10 Peel Centre Drive, Brampton, L6T 4B9, Suite B
Cell: 416-884-2434