Update on construction in your area
Indian Grove. Project 13-1347 H1
The Region of Peel has replaced the aging watermain on Indian Grove as part of our maintenance program. The previous watermain was installed in the 1950s and was at the end of its lifespan.
A larger watermain that provides water to the Lorne Park area was installed along with the smaller (local) watermain on Indian Grove. The local watermain is on one side of the street with the larger watermain on the opposite side of the street.
Completed work
The Contractor has:
- Installed concrete curb and sidewalk on Indian Road
- Restored the concrete median on Indian Road
- Completed the last remaining sections of concrete curb and sidewalk on Indian Grove
- Removed temporary asphalt and started paving driveway aprons on Indian Grove
Coming up in the next few weeks
Road and Driveway Paving
Paving was delayed due to weather and supply chain issues. The removal of the temporary asphalt took place this week, with paving on Indian Grove to begin the week of August 8, 2022.
Please do not park on the street from 7 a.m. to 7 p.m. during road paving operations.
You may not have access to your driveway while paving operations are crossing your property. The Contractor will coordinate with residents that have asphalt driveways being restored. Please contact us if you have special needs related to access.
Final repairs
Once paving has been completed, the Contractor will repair non-asphalt driveways (such as interlock or concrete driveways) and replace the sod (grass) and landscaping features damaged by our watermain construction activities.
Reducing the impact of construction
- For everyone’s safety, please take care and slow down when driving through the active construction area. It is safer if residents access their property from the south end of Indian Grove if their property is south of the active construction area, and from the north end if their property is north of construction.
- If we must shut off your water because of an emergency, we will do everything we can to fix the problem as quickly as possible.
- We will let you know if there are any significant project changes.
Questions or concerns?
- Visit the project webpage for ongoing updates
- Call 905-791-7800 extension 4409
- Email: construction@peelregion.ca