Peel Region homepage
Peel Region
Go
main

Sanitary sewer replacement and improvement

Notice of temporary road closure Roy Drive and Turney Drive. Project 16-2300 A 3B

The Region of Peel has been working in your neighborhood to replace the sanitary sewers and maintenance holes (commonly referred to as manholes). This work is required to maintain and improve existing wastewater services. Sanitary sewers are underground pipes that carry wastewater from your home to a wastewater treatment plant. Wastewater is created when water goes down the drain or is flushed down the toilet. As pipes age and our population grows, we need to replace older sewers to keep providing you with high quality wastewater services.

At this stage in the project, we will be digging deep trenches on Roy Drive and Turney Drive to install new sanitary sewers and wastewater service pipes. Temporary road closures will be required to complete this work.

Traffic impacts

The temporary road closures will take place in two stages:

During each stage, a detour route will be clearly marked with road signs. Please see the attached map for the detour routes. Residents who live on the street will have access to their homes. No through traffic will be allowed and there will be no on-street parking.

This road closure may cause traffic delays. We ask for your patience and will try to minimize any delays.

Keeping you informed

Weather and other unpredictable events may change the date of these traffic impacts. Receive timely project updates right to your inbox by signing up for e-notices. Information on this project can also be found on the project webpage.

Safety during construction

Construction zones require extra caution to keep everyone safe pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. Learn more about how to stay safe in construction zones.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality wastewater services. If you have any questions, please contact us.

Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409