Lining the wastewater service pipes

Pioneer Drive, Andrea Court, Joymar Drive, Theodore Drive, Donata Drive, Isherwood Court, Joycelyn Drive. Project 16-2300 A 3B

The Region of Peel has been working in your neighbourhood to replace the existing sanitary sewer system on Pioneer Drive, Andrea Court, Joymar Drive, Theodore Drive, Donata Drive, Isherwood Court, and Jocelyn Drive. Sanitary sewers are underground pipes that carry wastewater from your home to a wastewater treatment plant. Wastewater is created when water is flushed down the toilet, or goes down the drain in your sink, tub, or shower drain.

At this stage of the project, we will be relining a portion of the wastewater service pipe which carries wastewater from your home to the sanitary sewer system. (We typically only line the portion of the wastewater service pipe within municipal property, as it is the homeowner’s responsibility to maintain the portion on private property.)

This work involves cleaning and lining the inside of the wastewater service pipe with a resin (plastic) and fiber material to extend the service life of this pipe.

This work will be completed by LiquiForce under contract to the Region of Peel.

Liquiforce will be making multiple visits to your street to investigate, locate and clean your wastewater service pipe:

Any damage caused by Regional construction will be repaired:

Construction schedule

We expect to start relining affected wastewater service pipes on these streets in March 2023. We expect to complete this work by the end of April 2023.

Once we have connected all properties on each street to the new sanitary sewer, we will start repairing driveways, roads, curbs, sidewalks, and sod (grass).

Please note that repairs may be delayed due to contractor availability or weather conditions.

For example:

All work is under warranty for two years from the completion date.

Wastewater service interruptions

To complete this work, your wastewater service pipe will be out of service (plugged) for approximately 3 hours. (Wastewater service pipes carry wastewater from your home to the underground sanitary sewer system.) This temporary interruption allows for the pipe to be repaired without digging up the street. To advise you of the exact date and time of this service interruption, LiquiForce will provide you with a second notice at least 24 hours before the lining process begins.

It is important to minimize your water use while this work is underway:

These actions will reduce the possibility of sewage backing up into your basement or into your plumbing. If you have a sump pump, please notify us at construction@peelregion.ca or tell the contractor when they arrive at your property.

Odours

You may smell some odours while the synthetic resin inside the sewer cures. These odours are temporary and will dissipate within a few hours. You can prevent or minimize these odours by making sure you have water in all of your drains, including your basement floor drain. We recommend pouring a bucket of water down the floor drain and running the water in all sinks, showers, and tubs for a minute, either the evening before or day of the relining work.

Safety during construction

Construction zones require extra caution to keep everyone safe – pedestrians, cyclists, drivers, and construction workers. When driving, walking, or biking through the construction area, please be aware of your surroundings, watch for construction crews and other road users, slow down, account for delays, and consider other routes if possible. Learn more about how to stay safe in construction zones.

Staying informed

Receive timely updates right to your inbox by signing up for e-notices.

Information on this project can also be found on the project webpage.

We will let you know if there are any major changes to the plans.

Thank you for your patience as we complete this necessary work. This work will allow us to continue providing you with high quality wastewater services.

If you have any questions, please contact us.

Wastewater Collection and Conveyance
Engineering Services Division
Public Works, Region of Peel
Email: construction@peelregion.ca
Phone: 905-791-7800 ext. 4409