Sanitary pumping station replacement
Silver Birch Trail and Marshwood Place Project 16-2905, Assignment 1
What are we doing?
- Replacing and improving the aging sanitary sewer pumping station located at the end of Silver Birch Trail.
Why?
- To upgrade the wastewater system capacity and reliability as part of the Region of Peel’s State of Good Repair program. Pre-existing-conditions-survey-letter.
When?
- We expect to start work on or about October 11, 2021.
- The project should be completed by late May 2023. All work is under warranty for two years from the completion date.
Who can you call?
Region of Peel | ||
Contact Person | Responsibility | Phone Number |
---|---|---|
Paul Rastrullo | Project Manager | 905-452-2760 |
IBI Group IBI Group will provide consulting support services, under contract to the Region of Peel |
||
Renata Pugliese | Project Manager | 647-286-3075 |
Stephan Panarese | Inspector | 416-527-2501 |
North America Construction (NAC) NACwill do the work, under contract to the Region of Peel |
||
Jon Gordanier | Project Superintendent | 226-203-3973 |
Working hours
- Our contractor’s normal working hours are from 7 a.m. to 7 p.m. These hours are consistent with the local municipality’s bylaws. We understand this may cause some inconvenience, but a shorter working day would mean the project would take longer to complete.
Traffic, driveway and parking control
- All roads within the project limits will always remain open to traffic however we may need to temporarily reduce traffic to a single lane during some portions of the work.
- Due to construction activities, we may need to block your driveway for a short time. We will contact you before we do this to arrange for the best time and for alternate access, if needed.
- On-street parking will be reduced during construction.
Irrigation or sprinkler systems
- Please tell the inspector if you have underground irrigation or a sprinkler system outside your property line.
Trees
- If tree branches within the right-of-way interfere with construction, the contractor will have the trees pruned before equipment enters the drip line of the tree.
Vibrations
- You may feel slight vibrations from the construction work.
Replacing and taking care of your sod
- The contractor will take care of any sod we replace for 30 days.
- You can help the sod to stay healthy by watering it for one hour in the early morning, two or three times a week. This is especially important in hot or dry weather.
- We will replace your sod as soon as we can, but there may be a short delay.
Project updates
- The Region of Peel will always let you know if there are any major changes to the plans.
- We will try to disturb you as little as possible.
Construction statement regarding COVID-19
Construction is an essential service. We’re keeping employees, contractors and the community safe by complying with provincial regulations, physical distancing, using personal protective equipment, and adjusting work schedules and shifts.
Construction project updates can be found at peelregion.ca/construction.
Follow Peel Public Works on Twitter for service updates and changes.